Edmonds Master Bathroom, Driveway, and Bluestone Walkways
Scope of Work:
-Installation of Travertine tile over hydronic in-floor heating system.
-Fabrication and installation of Travertine Base.
-Installation of hand cut 3×6 subway tile.
-Grading and installation of paver driveway.
-Installation of Pennsylvania Bluestone walkways








EVERETT WHOLE HOUSE UPDATE
Scope of Work:
-Removed all existing finishes throughout the home with the exception of the kitchen cabinet boxes.
-Removed existing bathtub in master bathroom and replaced with a walk-in shower, upgraded finishes, and heated tile.
-Installed new tub enclosure and updated all finishes in the guest bath.
-New doors, base trim and fresh paint throughout the home.
-Replaced all kitchen cabinet doors and drawer fronts, new plumbing fixtures, and countertops.






Lake Stevens Porch with overhang
Scope of Work:
-Removed existing concrete patio and steps.
-Poured concrete pier blocks to support the new deck and porch loads
-Framed new deck and porch overhang.
-Installed Trex decking. New trim detail and T+G Pine for the porch overhang, skylights, and new can lighting.
*Painting to be completed by homeowner. T+G Pine to retain natural look.




Granite falls whole house renovation
Scope of Work:
*Painting and some woodworks were completed after I moved to Colorado. I did receive one photo of painted work which is the last photo in the set. Professional photos will be uploaded upon receiving them from client.
-Full remodel of Kitchen, Master Bathroom, Master Bedroom, and flooring throughout the home.
-Installed 21′ recessed steel I-Beam in kitchen to bump out wall adding an additional 80 sq feet of kitchen space.
-Replaced siding to match the rest of the home.
-Electrical and Plumbing upgrades throughout the home.
-Installation of custom-built cabinetry in the kitchen, new countertops, and Miele appliances.
-Installation of fold up style window in kitchen creating a passthrough effect to the deck outside.
-Altered layout of the Master Bedroom and Bathroom.
-Tile Shower with curbless entry.
-Installation of an 8′ LaCantina folding patio door.
-Altered patio area to bring it up to code compliance.
-Raised flooring 1/2″ throughout the home to keep the flooring heights consistent with the 3/16″ LVP.
-Wrapped stairs with LVP and added Board and Batten to the walls.
















Various tile projects and bathroom remodels




























A Tribute to all my favorite site helpers! Mine included






















*Please note, there are no “stock” photos on this webpage as is common on many websites. Every photo on this site is either work that I have personally installed, assisted in installing, or managed the overall construction installation process. This is my work.
E